Foundation Repair Before & After Photos

Click on a photo to enlarge.

Hide A Way Covers for GeoLocks Installed in Chilton, WI

To stabilize a home's foundation, the GeoLocks are the best solution, however, they aren't the prettiest view for a finished basement which is why we have the Hide A Way Covers. These covers fit perfectly over the GeoLocks leaving a clean, presentable look while also guaranteeing a stable foundation, it's the perfect solution!

Wall Stabilization System Fixes Bowing, Cracking Basement Walls in Chilton, WI

Before:
A homeowner in Chilton noticed one basement wall beginning to bow inward, with horizontal cracking along the mortar joints. The displacement suggested foundation movement caused by exterior soil pressure, creating concern about future structural stability.

After:
A PowerBrace™ wall stabilization system was installed along the affected wall to halt movement and gradually restore alignment. The galvanized steel I-beams were anchored to the basement floor and floor joists for consistent reinforcement.

The wall is now secure, and the homeowner has peace of mind knowing the foundation is stabilized.

Block Foundation Walls Stabilized with the PowerBrace System in Bonduel, WI

When a homeowner in Bonduel, WI, contacted us wanting to fully utilize their basement space, their main stumbling block was a compromised foundation, as you can see in the 'before' photo. Our solution? Installation of the PowerBrace system. Notice in the 'after' photo how these steel I-beams stabilized the walls without intrusive excavation. This repair not only secured the home's foundation but also opened up new possibilities for the basement area. 

PolyLevel Concrete Leveling in Hilbert

Polylevel being used to raise and level concrete pads near garage entrance to home. 

Foundation Inspected & Stabilized in Hilbert, WI

Before:
A Hilbert homeowner was dealing with bouncy, uneven floors, gaps at baseboards, and a sticky interior door. In the crawl space, aging wood posts were sitting on thin pads over soft soil, allowing the main beam and joists to settle over time.

 

After:
We installed the SmartJack® adjustable steel support system. Each jack was set on an engineered footing to distribute loads and resist future settlement. Where spans required it, we added a supplemental steel beam, then tightened the SmartJacks in controlled increments to bring floors back toward level and eliminate bounce.

 

The result is a stable first floor and an adjustable support system for long-term performance.

Service Map
Grey noise background texture

Proudly serving Central & Northeast Wisconsin - Green Bay, Oshkosh, Appleton, Wausau