Foundation Inspected & Stabilized in Hilbert, WI
Before:
A Hilbert homeowner was dealing with bouncy, uneven floors, gaps at baseboards, and a sticky interior door. In the crawl space, aging wood posts were sitting on thin pads over soft soil, allowing the main beam and joists to settle over time.
After:
We installed the SmartJack® adjustable steel support system. Each jack was set on an engineered footing to distribute loads and resist future settlement. Where spans required it, we added a supplemental steel beam, then tightened the SmartJacks in controlled increments to bring floors back toward level and eliminate bounce.
The result is a stable first floor and an adjustable support system for long-term performance.