Sagging Floors Stabilized with SmartJack Installation in Green Bay, WI
In Green Bay, WI, a failing basement presented a significant structural challenge for the homeowner, with weakened floor joists causing noticeable sagging. As demonstrated in the before photo, instability was a concern. We addressed this problem by implementing the SmartJack® System, aptly visible in the after photo. Our solution stabilized weakened floor joists by using galvanized steel columns on a steel base and distributed weight through an engineered fill. Equipped with adjustable top brackets, this installation restored stability and optimized elevation, leaving the homeowners reassured by proven foundation repair expertise.